top of page

AA Stinger
DATE
2016
LOCATION
11601 W Toughy Ave., Chicago, IL 60666
The tight space and lack of ground access required a unique solution for American Airlines. An elevated truss bridge was erected to avoid using valuable ground square footage. This structure was assembled and modularized in sections at night using a 330-ton crawler crane.
Project Gallery
bottom of page